Friday, July 29, 2011

Ducts and Pipes

Stopped by Friday after work and they had put in most of the duct work and some of the pipes.
















Tuesday, July 26, 2011

Shingles and Stairs

The roof now has shingles and they finally put in the stairs.  We were able to go take a look at the second floor which is all framed in as well as the basement.  I've gotta say being down in the basement it is huge.  The floor plans really don't express how big the basement actually is.















Start of the Roof

Stopped by the house after work and they have started putting on the roof.  With any luck they'll finish off the roof tomorrow.  We also have scheduled our first walk through for Thursday.  We will be meeting with Structured Cable to determine the locations for our Cable and Data Jacks.






Monday, July 25, 2011

Floor Number Two

They put in the second floor Saturday prior to it raining.  The stairs aren't in yet so we don't know if they've done the internal framing but at least we have outside walls.  They also came in and did the internal framing on the first floor.
















Friday, July 22, 2011

Walls all around

A good chunk of the first floor framing seems to be done.  It's amazing to see how far they actually get each day.