Sunday, August 14, 2011

Mudding and Taping commenced

Looks like they are about half way through the mudding process and they actually arrived to continue as I was leaving the house.  Also finally took a picture of the front of the house now that we have shutters.


Morning Room
Morning Room
Kitchen
Pantry and Fridge hole
Living Room
Office (aka Dining Room)
Office
Half Bath / Coat Closet
Stairs to the Basement
Central Air Unit
Egress Window
Network / Cable Box
Stair's to the Second Floor
Stair's to the Second Floor
Stair's to the Second Floor
Bathroom
Bedroom to the Right of Stairs
Bedroom to the Right of Stairs
Bedroom to the Right of Stairs
Bedroom to the Left of Stairs
Bedroom to the Left of Stairs
Bedroom to the Left of Stairs
Bedroom over the Garage
Bedroom over the Garage
Bedroom over the Garage
Master Bedroom
Master Bedroom
Master Bedroom
Master Closet
Front of the house now with shutters

1 comment: