Stopped by and they had put in the Sod in the front and side yards.  The back had been seeded and strawed but with all the wind today there wasn't much straw left.

Next week is going to be crazy.

Tuesday

  • Final walk-through
  • Meeting with insurance rep

Thursday

  • Close
  • Buy refrigerator, washer, dryer, blinds, etc...
  • Start Moving

Friday

  • Dish install
  • Comcast install (Hopefully)
  • Utilities get switched over
  • Continue Moving
Saturday

  • Finish Moving (Hopefully)


Front yard with sod, a tree and the mailbox.
Side Yard with Sod
The Little bit of yard to the left of the driveway with sod
The back yard with what was left of the Straw.
The back yard with what was left of the Straw.
Rear view of the side yard. Which is half cover with straw.

Friday, September 2, 2011

Appliances

The microwave, dishwasher and stove have been delivered.  The microwave is actually already installed.  Also have a couple of pictures from the basement now that we have lights down there and pictures can be taken.



Microwave and Stove
Dishwasher

Central Air and Water Pipes
Network / Cable Box
Network / Cable Box

Thursday, September 1, 2011

Surfaces

Several big visual changes. Driveway was built, including the 17 foot extension. The garage was also completed with the door, rails, and final steps built. Carpet was put in throughout the house. There are no really good images of the carpet as it is all covered with a protective plastic.

On Wednesday they were digging the trenches for the irrigation system, and had finished all the electrical connections in the house. All the switches and plugs were working.

Entry to drive.

More Driveway

Extension and stairs 

Close-up of extension 

Garage door open, stairs. 

Disturbed dirt where the irrigation was installed in the side yard. 

Upstairs bedroom carpeting

Fancy.

Kitchen to living room floor transition.

Garage door 

Front yard irrigation 

Front step railing