Several big visual changes. Driveway was built, including the 17 foot extension. The garage was also completed with the door, rails, and final steps built. Carpet was put in throughout the house. There are no really good images of the carpet as it is all covered with a protective plastic.

On Wednesday they were digging the trenches for the irrigation system, and had finished all the electrical connections in the house. All the switches and plugs were working.

Entry to drive.

More Driveway

Extension and stairs 

Close-up of extension 

Garage door open, stairs. 

Disturbed dirt where the irrigation was installed in the side yard. 

Upstairs bedroom carpeting

Fancy.

Kitchen to living room floor transition.

Garage door 

Front yard irrigation 

Front step railing

Accent Lamp 

Garage door again. 

Facade with drive