Thursday, September 15, 2011

Sod...

Stopped by and they had put in the Sod in the front and side yards.  The back had been seeded and strawed but with all the wind today there wasn't much straw left.

Next week is going to be crazy.

Tuesday

  • Final walk-through
  • Meeting with insurance rep

Thursday

  • Close
  • Buy refrigerator, washer, dryer, blinds, etc...
  • Start Moving

Friday

  • Dish install
  • Comcast install (Hopefully)
  • Utilities get switched over
  • Continue Moving
Saturday

  • Finish Moving (Hopefully)


Front yard with sod, a tree and the mailbox.
Side Yard with Sod
The Little bit of yard to the left of the driveway with sod
The back yard with what was left of the Straw.
The back yard with what was left of the Straw.
Rear view of the side yard. Which is half cover with straw.

Friday, September 2, 2011

Appliances

The microwave, dishwasher and stove have been delivered.  The microwave is actually already installed.  Also have a couple of pictures from the basement now that we have lights down there and pictures can be taken.



Microwave and Stove
Dishwasher

Central Air and Water Pipes
Network / Cable Box
Network / Cable Box

Thursday, September 1, 2011

Surfaces

Several big visual changes. Driveway was built, including the 17 foot extension. The garage was also completed with the door, rails, and final steps built. Carpet was put in throughout the house. There are no really good images of the carpet as it is all covered with a protective plastic.

On Wednesday they were digging the trenches for the irrigation system, and had finished all the electrical connections in the house. All the switches and plugs were working.

Entry to drive.

More Driveway

Extension and stairs 

Close-up of extension 

Garage door open, stairs. 

Disturbed dirt where the irrigation was installed in the side yard. 

Upstairs bedroom carpeting

Fancy.

Kitchen to living room floor transition.

Garage door 

Front yard irrigation 

Front step railing

Accent Lamp 

Garage door again. 

Facade with drive

Sunday, August 28, 2011

Survived the Storm

Stopped by this afternoon and there didn't seem to be any damage from Hurricane Irene.  They have put in the rebar for the garage floor so that should be poured on Monday.  They have also added the water heater and a lot of the plumbing fixtures. We also finally have some pictures of the granite they put in middle of the week.


Rebar for the garage floor.
Electric Meter
Granite
Granite
Granite
Guest Bathroom
Master Bathroom
Master Bathroom
Master Bathroom
First Floor Powder Room

First Floor Powder Room

Wednesday, August 24, 2011

Sidewalk and Deck

Stopped by after work and found they had poured the sidewalk out front and put in the deck in back.  We had asked for them to put the stairs on the deck right next to the sliding door but they put them more in the middle.  After seeing it though I think I like were they put them as now we can put a grill in between the stairs and the sliding door.  On the inside they had put in the vinyl and put on the, maybe, final coat of paint.

We also found out that our final walk through has been scheduled for September 20th and will close on either the 21st or 22nd.  Now we just have to get our mortgage rate locked in and we should be good to go.


Sidewalk
Deck

Saturday, August 20, 2011

Cabinets

We now have the cabinets in the kitchen and bathrooms.  They put in the cabinet that's supposed to go over the refrigerator to low but that is simple enough to fix.  They have also power lines from the box on the side of the house over to beside the driveway.  Added a few pictures but unfortunately it's too dark to get many good ones.


Electric Box
Kitchen Cabinets
Gourmet Island
Cabinet over refrigerator

Sunday, August 14, 2011

Mudding and Taping commenced

Looks like they are about half way through the mudding process and they actually arrived to continue as I was leaving the house.  Also finally took a picture of the front of the house now that we have shutters.


Morning Room
Morning Room
Kitchen
Pantry and Fridge hole
Living Room
Office (aka Dining Room)
Office
Half Bath / Coat Closet
Stairs to the Basement
Central Air Unit
Egress Window
Network / Cable Box
Stair's to the Second Floor
Stair's to the Second Floor
Stair's to the Second Floor
Bathroom
Bedroom to the Right of Stairs
Bedroom to the Right of Stairs
Bedroom to the Right of Stairs
Bedroom to the Left of Stairs
Bedroom to the Left of Stairs
Bedroom to the Left of Stairs
Bedroom over the Garage
Bedroom over the Garage
Bedroom over the Garage
Master Bedroom
Master Bedroom
Master Bedroom
Master Closet
Front of the house now with shutters